Featured Products

132P49CC6AG | ITT Neo-Dyn | Series 132P Pressure Switch/Internal Adjustment
Estimated Lead Time : 10 - 12 Weeks
(0)
USD1,384.00
Estimated Lead Time : 10 - 12 Weeks
132TC5JCC6AR20 | ITT Neo-Dyn | Series 132TC Temperature Switch/Internal Adjustment
Estimated Lead Time : 10 - 12 Weeks
(0)
USD2,970.00
Estimated Lead Time : 10 - 12 Weeks
1NN-K45-N1-A1A-C4 | SOR | Pressure and Vacuum Switches
Estimated Lead Time : 8 - 10 Weeks
(0)
USD1,621.00
Estimated Lead Time : 8 - 10 Weeks
21-11110-00 | Topworx | GO Switch Model 21 Side Sensing
Estimated Lead Time : 1 - 10 Working Days
(0)
USD400.00
Estimated Lead Time : 1 - 10 Working Days
5550-413-020 | Metrix | 5550 Mechanical Vibration Switches
Estimated Lead Time : 1 - 10 Working Days
(0)
USD10,400.00
Estimated Lead Time : 1 - 10 Working Days
7MF0300-1JD01-5BF1-Z A00+C11+E20+Y01 | Siemens | SITRANS P320 Pressure Transmitter
Estimated Lead Time : 10 - 12 Weeks
(0)
USD712.00
Estimated Lead Time : 10 - 12 Weeks
9NN-K45-N1-A1A-C4 | SOR | Pressure and Vacuum Switches
Estimated Lead Time : 8 - 10 Weeks
(0)
USD1,347.00
Estimated Lead Time : 8 - 10 Weeks
A06B-6127-H209 | FANUC | ai SV series 2-Axis Amplifier | 400-V Input Series
Estimated Lead Time : 1 - 10 Working Days
(0)
USD1,517.00
Estimated Lead Time : 1 - 10 Working Days
AWT210.A.2.C2.H1.Y0-A2...M5 | ABB | AWT210 2-Wire Conductivity, pH/ORP pION Transmitter
Estimated Lead Time : 12 - 14 Weeks
(0)
USD3,895.00
Estimated Lead Time : 12 - 14 Weeks
DPI610E-HC-165G-U0-B0 | Druck | DPI610E Series Druck Hand-held Pressure Calibrator
Estimated Lead Time : 8 - 10 Weeks
(0)
USD14,653.00
Estimated Lead Time : 8 - 10 Weeks
DPI610E-PC-13G-U0-B0-M | Druck | DPI610E Series Druck Hand-held Pressure Calibrator
Estimated Lead Time : 1 - 10 Working Days
(0)
USD9,937.00
Estimated Lead Time : 1 - 10 Working Days
DXP-E21GN4B | Topworx | D-SERIES DISCRETE VALVE CONTROLLERS
Estimated Lead Time : 7 - 9 Weeks
(0)
USD993.00
Estimated Lead Time : 7 - 9 Weeks
DXP-Z21GNES1621 | Topworx | D-SERIES DISCRETE VALVE CONTROLLERS
Estimated Lead Time : 5 - 7 Weeks
(0)
USD3,478.00
Estimated Lead Time : 5 - 7 Weeks
EJA530E-DBS7N-010NN/D4/HE | Yokogawa | EJA530E Gauge Pressure Transmitter
Estimated Lead Time : 3 - 4 Months
(0)
USD762.00
Estimated Lead Time : 3 - 4 Months
FBM241C | Foxboro ( by Schneider Electric ) | Redundant, Discrete I/O Modules
Estimated Lead Time : 1 - 10 Working Days
(0)
USD517.00
Estimated Lead Time : 1 - 10 Working Days
LMT200.E2.S6.R1.B1.D1.L2.H1-......//.C1.C4.GD1.GD3.M5.R5>>381MM | ABB | LMT200 External Mount Magnetostrictive Level Transmitter
LV300 L=200mm | Shinko | LV-300 LEVEL SWITCH
Estimated Lead Time : 1 - 10 Working Days
(0)
USD367.00
Estimated Lead Time : 1 - 10 Working Days
LV300 L=250mm | Shinko | LV-300 LEVEL SWITCH
Estimated Lead Time : 1 - 10 Working Days
(0)
USD400.00
Estimated Lead Time : 1 - 10 Working Days
MCS100A100 | Azbil | MCS100 Series Air Mass Flow Sensor
Estimated Lead Time : 1 - 10 Working Days
(0)
USD221.00
Estimated Lead Time : 1 - 10 Working Days
MCS100A501 | Azbil | MCS100 Series Air Mass Flow Sensor
Estimated Lead Time : 1 - 10 Working Days
(0)
USD262.00
Estimated Lead Time : 1 - 10 Working Days
PLICSCOM.XW | VEGA | Pluggable display and adjustment module for plicsĀ® sensors
Estimated Lead Time : 8 - 10 Weeks
(0)
USD552.00
Estimated Lead Time : 8 - 10 Weeks
PM6C1CJ-3AAAPWP | WATLOW | PM6 PM PLUS Controller
Estimated Lead Time : 1 - 2 Weeks
(0)
USD837.00
Estimated Lead Time : 1 - 2 Weeks
POL688.80/STD | Siemens | Climatix C600 controller with HMI
Estimated Lead Time : 1 - 10 Working Days
(0)
USD971.00
Estimated Lead Time : 1 - 10 Working Days
POL895.51/CHN | Siemens | HMI-DM POL895.5x with cable - screen 96 x 208
Estimated Lead Time : 1 - 10 Working Days
(0)
USD281.00
Estimated Lead Time : 1 - 10 Working Days
POL902.00/STD | Siemens | Climatix RS-485 Modbus module
Estimated Lead Time : 1 - 10 Working Days
(0)
USD223.00
Estimated Lead Time : 1 - 10 Working Days
POL94E.00/STD | Siemens | Climatix extension module ECV
Estimated Lead Time : 1 - 10 Working Days
(0)
USD458.00
Estimated Lead Time : 1 - 10 Working Days
POL94U.00/STD | Siemens | Climatix extension module ECV
Estimated Lead Time : 1 - 10 Working Days
(0)
USD519.00
Estimated Lead Time : 1 - 10 Working Days
POL965.00STD | Siemens | Climatix extension module 15 I/Os
Estimated Lead Time : 1 - 10 Working Days
(0)
USD290.00
Estimated Lead Time : 1 - 10 Working Days
QPL25 | Siemens | Gas Pressure Switch
Estimated Lead Time : 1 - 10 Working Days
(0)
USD3.20
Estimated Lead Time : 1 - 10 Working Days
SM87PBMSD3BOYHR | MEDC | SM87PB Manual Call Point Range
Estimated Lead Time : 6 - 8 Weeks
(0)
USD2,160.00
Estimated Lead Time : 6 - 8 Weeks
VFD022C43A-21 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD439.00
Estimated Lead Time : 1 - 10 Working Days
VFD037C43A-21 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD497.00
Estimated Lead Time : 1 - 10 Working Days
VFD110C43A-21 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD615.00
Estimated Lead Time : 1 - 10 Working Days
VFD185C43A-21 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD924.00
Estimated Lead Time : 1 - 10 Working Days
VFD220C23A-21 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD1,727.00
Estimated Lead Time : 1 - 10 Working Days
VFD2800C43A-00 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD11,531.00
Estimated Lead Time : 1 - 10 Working Days
VFD4000C43A-00 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD17,793.00
Estimated Lead Time : 1 - 10 Working Days
VFD450C43S-00 | DELTA | C2000 Series Drive
Estimated Lead Time : 1 - 10 Working Days
(0)
USD1,719.00
Estimated Lead Time : 1 - 10 Working Days
VGD40.125L | Siemens | Double Gas Valve (DN125)
Estimated Lead Time : 1 - 10 Working Days
(0)
USD6,080.00
Estimated Lead Time : 1 - 10 Working Days
VGD40.150L | Siemens |  Double Gas Valve Body (Normally Closed)
Estimated Lead Time : 1 - 10 Working Days
(0)
USD9,600.00
Estimated Lead Time : 1 - 10 Working Days

The cookie settings on this website are set to 'allow all cookies' to give you the very best experience. Please click Accept Cookies to continue to use the site.

Logo