MTL Instruments

The MTL Instruments Group plc, a division of Cooper Industries, is an international business headquartered in Luton, UK. The company produces electronic instrumentation and protection equipment for telecommunication and process control systems, including power systems, safety interfaces and surge protection.

For models not found in our website, please send your enquiry to [email protected] or CLICK HERE

Your enquiry will be answered within 24 hours

Products (Total Items: 143)
Sort by:
More results: 1 2 3 4 5 Next Page
 MTL5532
$269.00
Estimated Lead Time : In stock. Usually ships in 7-10 working days.
 MTL5532
$150.00
Out of Stock
5544 | MTL Instruments | Repeater Power Supply
$646.00
Estimated Lead Time : In stock. Usually ships in 7-10 working days
8012-CC-85| IS Signal extension cable, 0.85m
$142.00
Estimated Lead Time : 6-8 Weeks
8017-CC-85| IS Power extension cable, 0.85m
$57.00
Estimated Lead Time : 6-8 Weeks
8031-CE-LH| IS Carrier extender, left hand
$149.00
Estimated Lead Time : 6-8 Weeks
8201-HI-IS| 8-channel IS AI, 4-20mA with Hart
$1,919.00
Estimated Lead Time : 6-8 Weeks
8202-HO-IS| 8-channel IS AO, 4-20 mA with Hart
$1,919.00
Estimated Lead Time : 6-8 Weeks
8206-TI-IS| 8-channel IS RTD input
$1,481.00
Estimated Lead Time : 6-8 Weeks
8220-DI-IS| 16-channel IS DI, switch/promixmity detector
$869.00
Estimated Lead Time : 6-8 Weeks
8502-BI-DP| Profibus BIM
$1,015.00
Estimated Lead Time : 6-8 Weeks
8621-FT-IS| IS Field terminal, standard
$68.00
Estimated Lead Time : 6-8 Weeks
8623-FT-IS| IS Field terminal for 8220-DI-IS 16 ch DI & V/Pot inputs
$104.00
Estimated Lead Time : 6-8 Weeks
8626-FT-IS| IS Field terminal, RTD
$104.00
Estimated Lead Time : 6-8 Weeks
8715-CA-BI| BIM only carrier, DB-9 connectors; Profibus & MODBUS LANs
$237.00
Estimated Lead Time : 6-8 Weeks
8717-CA-PS| Power supply (8910-PS-DC) carrier
$190.00
Estimated Lead Time : 6-8 Weeks
8723-CA-RB| Railbus isolator carrier (needed with all 2/1 systems)
$137.00
Estimated Lead Time : 6-8 Weeks
8724-CA-PS| IS module power supply carrier
$137.00
Estimated Lead Time : 6-8 Weeks
8727-CA-08| 8 module IS carrier
$439.00
Estimated Lead Time : 6-8 Weeks
8920-PS-DC| IS module DC power supply (8 modules)
$1,426.00
Estimated Lead Time : 6-8 Weeks
8922-RB-IS| Railbus signal isolator (needed with all 2/1 systems)
$850.00
Estimated Lead Time : 6-8 Weeks
BPHM64 HART backplane
$667.00
Estimated Lead Time : In stock. Usually ships in 7-10 working days.
BPYR2-AA141 | MTL Instruments
$647.00
Estimated Lead Time : 8 - 10 weeks.
CPS16 | MTL Instruments | 16-way backplane screw-clamp connector
$296.00
Estimated Lead Time : In stock. Usually ships in 7-10 working days.
CPS16C-250 | MTL Instruments | General purpose bus powered
$992.00
Estimated Lead Time : 6-8 Weeks
IOP HC32 | MTL Instruments | IOP Surge Protection Device
$89.00
Estimated Lead Time : 7 - 10 working days.
MA15/D/1/SI | MTL Instruments | Mains Power Surge Protector
$144.00
Estimated Lead Time : 1 - 2 weeks.
MA15/D/2/SI | MTL Instruments | AC Power Surge Suppressor And Filter
$136.00
Estimated Lead Time : 1 - 2 weeks.
MCK45
$110.00
Estimated Lead Time : 1-2 Weeks
MPA5500 | MTL Instruments | MPA5500 A.C. POWER ADAPTOR
$147.00
Estimated Lead Time : 4-6 Weeks
More results: 1 2 3 4 5 Next Page

NEX Instrument Inc is not an authorized dealer, agent or associate of any of the designers, brands, or manufacturers, the products of which are offered for sale on www.nexinstrument.com. All trademarks, brand names, and logos mentioned are used for identification purposes only and are registered trademarks of their respective owners who reserve the right of ownership. The use of trademark, brand name or product on our website is not intended to suggest that the company, trademark or brand is affiliated to or endorses our website. All items are 100% authentic and legally purchased from authorized sources.