1. Home
  2. MTL Instruments
Products (Total Items: 202)
Sort by:
8012-CC-85| IS Signal extension cable, 0.85m
IS Signal extension cable, 0.85m
(0)
USD171.00
Estimated Lead Time : 6-8 Weeks
8017-CC-85| IS Power extension cable, 0.85m
IS Power extension cable, 0.85m
(0)
USD70.00
Estimated Lead Time : 6-8 Weeks
8031-CE-LH| IS Carrier extender, left hand
IS Carrier extender, left hand
(0)
USD181.00
Estimated Lead Time : 6-8 Weeks
8103-AI-TX | MTL Instruments | 8-channel Analog Input
(0)
USD1,310.00
Estimated Lead Time : 1 - 2 WEEKS
8201-HI-IS | MTL Instruments | 8-channel IS AI, 4-20mA with Hart
USD 1919 | dimension and weight by aida - 26/2/21
(0)
USD2,069.00
Estimated Lead Time : 1 - 2 WEEKS
8202-HO-IS| 8-channel IS AO, 4-20 mA with Hart
8-channel IS AO, 4-20 mA with Hart
(0)
USD2,318.00
Estimated Lead Time : 6-8 Weeks
8206-TI-IS| 8-channel IS RTD input
8-channel IS RTD input
(0)
USD1,788.00
Estimated Lead Time : 6-8 Weeks
8215-DO-IS | MTL Instruments | 4-channel Discrete Output
(0)
USD2,107.00
Estimated Lead Time : 8 - 10 weeks.
8220-DI-IS | MTL Instruments | 16-channel Discrete Input, Switch/promixmity detector
16-channel IS DI, switch/promixmity detector
(0)
USD1,379.00
Estimated Lead Time : 1 - 2 WEEKS
8230-AI-IS | MTL Instruments | 8-channel Analog Input, 0-10V/potentiometer input
8502-BI-DP| MTL Instruments | Bus Interface Module (BIM)
(0)
USD7,250.00
Estimated Lead Time : 4 - 6 Weeks.
8510-MO-NS | MTL Instruments | Node Services Module
(0)
USD1,399.00
Estimated Lead Time : 8 - 10 weeks.
8621-FT-IS| IS Field terminal, standard
IS Field terminal, standard
(0)
USD81.00
Estimated Lead Time : 6-8 Weeks
8623-FT-IS| IS Field terminal for 8220-DI-IS 16 ch DI & V/Pot inputs
IS Field terminal for 8220-DI-IS 16 ch DI & V/Pot inputs
(0)
USD125.00
Estimated Lead Time : 6-8 Weeks
8626-FT-IS| IS Field terminal, RTD
IS Field terminal, RTD
(0)
USD125.00
Estimated Lead Time : 6-8 Weeks
8717-CA-PS| Power supply (8910-PS-DC) carrier
8910-PS-DC only Carrier
(0)
USD228.00
Estimated Lead Time : 6-8 Weeks
8723-CA-RB| Railbus isolator carrier (needed with all 2/1 systems)
Railbus isolator carrier (needed with all 2/1 systems)
(0)
USD165.00
Estimated Lead Time : 6-8 Weeks
8724-CA-PS| IS module power supply carrier
IS module power supply carrier
(0)
USD165.00
Estimated Lead Time : 6-8 Weeks
8727-CA-08| 8 module IS carrier
8 module IS carrier
(0)
USD530.00
Estimated Lead Time : 6-8 Weeks
8910-PS-DC | MTL Instruments | System power supply
(0)
USD4,608.00
Estimated Lead Time : 8 - 10 weeks.
8914-PS-AC | MTL Instruments | Power Supplies
(0)
USD993.00
Estimated Lead Time : Usually ships in 1-10 working days.
8920-PS-DC| IS module DC power supply (8 modules)
IS module DC power supply (8 modules)
(0)
USD1,722.00
Estimated Lead Time : 6-8 Weeks
8922-RB-IS | MTL Instruments |  Railbus signal isolator (needed with all 2/1 systems)
Railbus signal isolator (needed with all 2/1 systems)
(0)
USD2,345.00
Estimated Lead Time : Usually ships in 1-10 working days.
9377-FB-R | MTL | Fieldbus Barrier Module (6-Spur)
(0)
USD3,827.00
Estimated lead time :  8 - 9 Weeks 
BPHM64 | MTL Instruments | HART backplane
(0)
USD680.00
Estimated lead time :  4-6 Weeks 
BPYR2-AA141 | MTL Instruments
(0)
USD928.00
Estimated Lead Time : 8 - 10 weeks.
BPYR3-AVO841 | MTL Instruments | HART enabled backplanes
(0)
USD1,931.00
Estimated Lead Time : 6-8 Weeks
BPYR3-DI151 | MTL Instruments | Backplane Module
(0)
USD646.00
Estimated Lead Time : Usually ships in 1-10 working days.
1 2 3 4 5 6 7 Next Page

The cookie settings on this website are set to 'allow all cookies' to give you the very best experience. Please click Accept Cookies to continue to use the site.