Products [539]

Sort by:
Z201-H | Seneca | AC Current to DC I/V Isolator/Conv.85..265Vac/dc
AC current to DC isolator / converter, 85..265 Vac/dc
Estimated Lead Time : 4 - 6 Weeks
(0)
USD203.00
Estimated Lead Time : 4 - 6 Weeks
Z202-H | Seneca | AC Voltage(500 A);to DC I/V Isolator/Conv.85..265Vac/dc
AC voltage to DC isolator / converter, 85-265 Vac/dc
Estimated Lead Time : 4 - 6 Weeks
(0)
USD262.00
Estimated Lead Time : 4 - 6 Weeks
Z110S | Seneca | DC current isolator (self-powered) single channel
DC current isolator (self-powered) single channel
Estimated Lead Time : 4 - 6 Weeks
(0)
USD143.00
Estimated Lead Time : 4 - 6 Weeks
S311A-6-H | Seneca | 6 digit indicator, universal analog input, 80-265 Vac
Universal analog input indicator - totalizer, 80-265 Vac, 6 digit
Estimated Lead Time : 4 - 6 Weeks
(0)
USD318.00
Estimated Lead Time : 4 - 6 Weeks
S400CL-1-P5 | Seneca | S400CL-1 closing side (5 pieces)
S400CL-1 closing side (5 pieces)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD7.00
Estimated Lead Time : 4 - 6 Weeks
A-DIN-T201  | Seneca | DIN rail plastic clip for T201 Series
DIN rail plastic clip for T201 Series
Estimated Lead Time : 4 - 6 Weeks
(0)
USD9.00
Estimated Lead Time : 4 - 6 Weeks
FLEX-DIN| Seneca |DIN rail adapter for T120 and T121
DIN rail adapter for T120 and T121
Estimated Lead Time : 4 - 6 Weeks
(0)
USD11.00
Estimated Lead Time : 4 - 6 Weeks
CE-RJ45-RJ45-R | Seneca | Straight-thru Ethernet cable (RJ45-RJ45)
Straight-thru Ethernet cable (RJ45-RJ45)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD12.00
Estimated Lead Time : 4 - 6 Weeks
CU-A-MICROB | Seneca | USB-A Micro USB-B 5 P plug cable
USB-A Micro USB-B 5 P plug cable
Estimated Lead Time : 4 - 6 Weeks
(0)
USD12.00
Estimated Lead Time : 4 - 6 Weeks
CU-A-MICRO-OTG | Seneca | Micro USB OTG to USB Type A (female) Adapter Cable
Micro USB OTG to USB Type A (female) Adapter Cable
Estimated Lead Time : 4 - 6 Weeks
(0)
USD12.00
Estimated Lead Time : 4 - 6 Weeks
CU-A-MINIB-1 | Seneca | USB-A Mini USB-B 5 P plug cable, 1 mt
USB-A Mini USB-B 5 P plug cable, 1 mt
Estimated Lead Time : 4 - 6 Weeks
(0)
USD12.00
Estimated Lead Time : 4 - 6 Weeks
CU-A-MINIB-2 | Seneca | USB-A Mini USB-B 5 P plug cable, 2 mt
USB-A Mini USB-B 5 P plug cable, 2 mt
Estimated Lead Time : 4 - 6 Weeks
(0)
USD12.00
Estimated Lead Time : 4 - 6 Weeks
ALIM-MY2 | Seneca | Power Supply Unit for MYALARM2 and R-KEY-LT
Power Supply Unit for MYALARM2 and R-KEY-LT
Estimated Lead Time : 4 - 6 Weeks
(0)
USD16.00
Estimated Lead Time : 4 - 6 Weeks
K-BUS | Seneca | Expandable power supply connector
Expandable power supply connector
Estimated Lead Time : 4 - 6 Weeks
(0)
USD19.00
Estimated Lead Time : 4 - 6 Weeks
BATT-MY2 | Seneca | Lithium Polymer (LiPo) Battery Pack 3.7V - 1200mAh for MY2
Lithium Polymer (LiPo) Battery Pack 3.7V - 1200mAh for MYALARM2
Estimated Lead Time : 4 - 6 Weeks
(0)
USD22.00
Estimated Lead Time : 4 - 6 Weeks
CE-RJ45-RJ45-C | Seneca | Crossover Ethernet cable (RJ45-RJ45)
Crossover Ethernet cable (RJ45-RJ45)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD24.00
Estimated Lead Time : 4 - 6 Weeks
CS-DB9M-MEF-PH | Seneca | Serial comm. cable (DB9M / MEF 10-12) 3 wires, 1,5 mt
Serial communication cable (DB9M / MEF 10-12) 3 wires, 1,5 mt
Estimated Lead Time : 4 - 6 Weeks
(0)
USD24.00
Estimated Lead Time : 4 - 6 Weeks
CS-TIP-MEF-PH | Seneca | Serial communication cable (tips/4-ways connector)
Serial communication cable (tips/4-ways connector)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD24.00
Estimated Lead Time : 4 - 6 Weeks
USB-SW-KEY | Seneca | USB-key with controllers software, libraries, manuals
USB-key with software, libraries, platforms and development environments, manuals for Multifunction controllers
Estimated Lead Time : 4 - 6 Weeks
(0)
USD22.00
Estimated Lead Time : 4 - 6 Weeks
CS-RJ10-DB25M-1 | Seneca | Communication cable for modem (RJ10 / DB25M)
Communication cable for modem (RJ10 / DB25M)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD26.00
Estimated Lead Time : 4 - 6 Weeks
CS-RJ10-DB25M-2 | Seneca | Comm. cable for modem and oper. panels (RJ10 / DB25M)
Communication cable for modem and operator panels (RJ10 / DB25M)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD26.00
Estimated Lead Time : 4 - 6 Weeks
CS-TPW-TPW | Seneca | Tp-Wire cable (Tp-Wire / Tp-Wire)
Tp-Wire cable (Tp-Wire / Tp-Wire)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD26.00
Estimated Lead Time : 4 - 6 Weeks
TAC-C5-01005-023 | Seneca | Current Transducer 100/5A CL.0,5 23MM
Current Transducer 100/5A CL.0,5 23MM
Estimated Lead Time : 4 - 6 Weeks
(0)
USD63.00
Estimated Lead Time : 4 - 6 Weeks
TAC-C5-01505-023 | Seneca | Current Transducer  150/5A CL.0,5 23MM
Current Transducer 150/5A CL.0,5 23MM
Estimated Lead Time : 4 - 6 Weeks
(0)
USD63.00
Estimated Lead Time : 4 - 6 Weeks
TAC-C5-02505-023 | Seneca | Current Transducer 250/5A CL.0,5 23MM
Current Transducer 250/5A CL.0,5 23MM
Estimated Lead Time : 4 - 6 Weeks
(0)
USD63.00
Estimated Lead Time : 4 - 6 Weeks
TCK-W-1000-M12 | Seneca | TC type K, joint exposed, L=1000 mm, M12 connector
Thermocouple type K, joint exposed, L=1000 mm, M12 connector
Estimated Lead Time : 4 - 6 Weeks
(0)
USD28.00
Estimated Lead Time : 4 - 6 Weeks
A-GPS-SMA | Seneca | GPS antenna with SMA connector
GPS antenna with SMA connector
Estimated Lead Time : 4 - 6 Weeks
(0)
USD31.00
Estimated Lead Time : 4 - 6 Weeks
CS-DB9F-CFV10 | Seneca | RS232 connection cable (DB9F-CFV10)
RS232 connection cable (DB9F-CFV10)
Estimated Lead Time : 4 - 6 Weeks
(0)
USD31.00
Estimated Lead Time : 4 - 6 Weeks
CS-DB9F-CLAMP | Seneca | RS485 conn. cable (DB9F-Clamps) for VISUAL
RS485 connection cable (DB9F-Clamps) for operator panels VISUAL
Estimated Lead Time : 4 - 6 Weeks
(0)
USD31.00
Estimated Lead Time : 4 - 6 Weeks
CS-DB9F-DB25M | Seneca | Serial connection cable S21N - FH190-24
Serial connection cable S21N - FH190-24
Estimated Lead Time : 4 - 6 Weeks
(0)
USD31.00
Estimated Lead Time : 4 - 6 Weeks

The cookie settings on this website are set to 'allow all cookies' to give you the very best experience. Please click Accept Cookies to continue to use the site.

Logo