Products [54]

Sort by:
329A3529P001 | Metrix | Velocity Sensor
Estimated Lead Time : 2 - 4 weeks.
(0)
USD1,738.00
Estimated Lead Time : 2 - 4 weeks.
4850-010 | Metrix | High Temperature Armored Cable Assembly
Estimated Lead Time : 4-6 Weeks
(0)
USD1,394.00
Estimated Lead Time : 4-6 Weeks
4850-050 | Metrix | High Temperature Armored Cable Assembly
Estimated Lead Time : 6 - 8 Weeks
(0)
USD2,256.00
Estimated Lead Time : 6 - 8 Weeks
4850-020-0 | Metrix | High Temperature Armored Cable Assembly
Estimated Lead Time : 4-6 Weeks
(0)
USD1,553.00
Estimated Lead Time : 4-6 Weeks
5550-113-010 | Metrix |  Mechanical Vibration Switch
Estimated Lead Time : 4 - 6 weeks.
(0)
USD1,263.00
Estimated Lead Time : 4 - 6 weeks.
Metrix Seismic Velocity Transmitter: ST5484E-123-032-00
Estimated Lead Time : 3 - 4 weeks.
(0)
USD1,658.00
Estimated Lead Time : 3 - 4 weeks.
4850-030 | Metrix | High Temperature Armored Cable Assembly
Estimated lead time :  4-6 Weeks 
(0)
USD1,803.00
Estimated lead time :  4-6 Weeks 
4850-034 | Metrix | High Temperature Armored Cable Assembly
Estimated Lead Time : 6-8 Weeks.
(0)
USD1,875.00
Estimated Lead Time : 6-8 Weeks.
5485C-008 | Metrix | Velocity Sensor with Removable Cable (Stop Production. New Replacement : 5485C-535 Velocity Sensor)
Estimated Lead Time : 4 - 6 Weeks.
(0)
USD1,736.00
Estimated Lead Time : 4 - 6 Weeks.
5485C-004 | Metrix | Velocity Sensor with Removable Cable
Estimated Lead Time : 6 - 8 Weeks
(0)
USD3,408.00
Estimated Lead Time : 6 - 8 Weeks
5485C-006 | Metrix | Velocity Sensor with Removable Cable
Estimated Lead Time : 4-6 Weeks
(0)
USD3,360.00
Estimated Lead Time : 4-6 Weeks
5550-011-010 | Metrix | 5550 Mechanical Vibration Switch
Estimated Lead Time : 8 - 10 Weeks
(0)
USD1,373.00
Estimated Lead Time : 8 - 10 Weeks
ST5484E-152-0032-00 | Metrix | ST5484E Seismic Velocity 4-20 mA Transmitter
Estimated Lead Time : 6 - 8 weeks.
(0)
USD1,768.00
Estimated Lead Time : 6 - 8 weeks.
5550-421-141 | Metrix | 5550 Mechanical Vibration Switch
Estimated Lead Time : 6 - 8 weeks.
(0)
USD2,331.00
Estimated Lead Time : 6 - 8 weeks.
5485C-003-002 | Metrix | 5485C-AAA-BBB Velocity Sensor with Integral Cable
Estimated Lead Time : 6 - 8 weeks.
(0)
USD3,385.00
Estimated Lead Time : 6 - 8 weeks.
ST5484E-121-0200-00 | Metrix | ST5484E Seismic Velocity 4-20 mA Transmitter
Estimated Lead Time : 6 - 8 weeks.
(0)
USD1,550.00
Estimated Lead Time : 6 - 8 weeks.
MX2030-03-010-150-50-00 | Metrix | MX2030 Proximity Probe
Estimated Lead Time : 4-6 Weeks.
(0)
USD1,038.00
Estimated Lead Time : 4-6 Weeks.
5485C-007-040 | Metrix | Velocity Sensor with Integral Cable
Estimated Lead Time : 8 - 10 weeks.
(0)
USD5,365.00
Estimated Lead Time : 8 - 10 weeks.
SW6000-6021-250 | Metrix | Electronic Vibration Switch
Estimated Lead Time : 6 - 8 weeks.
(0)
USD5,069.00
Estimated Lead Time : 6 - 8 weeks.
 5485C-535 | Metrix | Velocity Sensor
Estimated Lead Time : 2 - 4 weeks.
(0)
USD1,738.00
Estimated Lead Time : 2 - 4 weeks.
5534-003-125-150-S | Metrix | Velocity Signal Conditioner
Estimated Lead Time : 4 - 6 weeks.
(0)
USD4,145.00
Estimated Lead Time : 4 - 6 weeks.
5550-421-041 | Metrix | 5550 Mechanical Vibration Switch
Estimated Lead Time : 6-8 Weeks.
(0)
USD1,840.00
Estimated Lead Time : 6-8 Weeks.
SW6000-8033-550 | Metrix | SW6000 Electronic Vibration Switch
Estimated Lead Time : Usually ships in 1-10 working days.
(0)
USD5,280.00
Estimated Lead Time : Usually ships in 1-10 working days.
ST5484E-121-020-00-0 | Metrix | ST5484E Seismic Velocity 4-20 mA Transmitter
Estimated Lead Time : 4 - 6 weeks.
(0)
USD1,908.00
Estimated Lead Time : 4 - 6 weeks.
5550-211-211 | Metrix | Mechanical Vibration Switch
Estimated Lead Time : 2-3 Weeks
(0)
USD1,739.00
Estimated Lead Time : 2-3 Weeks
ST5484E-121-110-00 | Metrix | Seismic Velocity 4-20mA Transmitter
Estimated Lead Time : 4 - 6 weeks.
(0)
USD1,618.00
Estimated Lead Time : 4 - 6 weeks.
5550-C21-044 | Metrix | Mechanical Vibration Switches
Estimated Lead Time : 4 - 6 weeks.
(0)
USD1,800.00
Estimated Lead Time : 4 - 6 weeks.
5550-421-320 | Metrix | Mechanical Vibration Switches
Estimated Lead Time : 4 - 6 weeks.
(0)
USD2,029.00
Estimated Lead Time : 4 - 6 weeks.
5550-011-210 | Metrix | Mechanical Vibration Switches
Estimated Lead Time : 6 - 8 weeks.
(0)
USD1,260.00
Estimated Lead Time : 6 - 8 weeks.
5550-111-010 | Metrix | Mechanical Vibration Switches
Estimated Lead Time : 6 - 8 Weeks.
(0)
USD1,118.00
Estimated Lead Time : 6 - 8 Weeks.

The cookie settings on this website are set to 'allow all cookies' to give you the very best experience. Please click Accept Cookies to continue to use the site.