Burner Controls
Sub-Categories
weight and dimension by aida - 07/05/21
Estimated Lead Time : 1-10 Working Days
(0)
USD5,517.00
Estimated Lead Time : 1-10 Working Days
Mod motor
Estimated Lead Time : 6-8 Weeks
(0)
USD1,989.00
Estimated Lead Time : 6-8 Weeks
DAMPER ACTUATOR, PROPORTIONING, 2-10 VDC 25 LB-IN TORQUE, 90 DEG STROKE, 90 SEC TIMING, CW SPRING RETURN, NORM CLOSED, USED W/C7150B W/CRANK ARM, 24 VAC, 50/60 HZ
Estimated Lead Time : 6-8 Weeks
(0)
USD689.00
Estimated Lead Time : 6-8 Weeks
24V 50/60HZ 24VA 35LB-IN 90 DEG ADJ STROKE 30-60 SEC 10-13.5VDC DUAL SHAFT
Estimated Lead Time : 6-8 Weeks
(0)
USD1,074.00
Estimated Lead Time : 6-8 Weeks
REPLACES M734H1000 120V 50/60HZ 24VA 35LB-IN 90 DEG ADJ STROKE 30-60 SEC 10-13.5VDC INPUT DUAL SHAFT.
Estimated Lead Time : 6-8 Weeks
(0)
USD1,074.00
Estimated Lead Time : 6-8 Weeks
MOTOR
Estimated Lead Time : 6-8 Weeks
(0)
USD638.00
Estimated Lead Time : 6-8 Weeks
MODUTROL MOTOR
Estimated Lead Time : 6-8 Weeks
(0)
USD884.00
Estimated Lead Time : 6-8 Weeks
IMMERSION WELL LESS THERMISTOR SENSOR WITH CASE, TERMINAL BOARD AND COVER, 5 3/8" INSERT 4" SPUD LENGTH 1/2" NPT.
Estimated Lead Time : 6-8 Weeks
(0)
USD426.00
Estimated Lead Time : 6-8 Weeks
Control Box TF 801
Estimated Lead Time : 6 - 8 Weeks
(0)
USD176.00
Estimated Lead Time : 6 - 8 Weeks
Control Box TF 834E unit pack
Estimated Lead Time : 6 - 8 Weeks
(0)
USD171.00
Estimated Lead Time : 6 - 8 Weeks
Control Box TF836.3 Giersch
Estimated Lead Time : 6 - 8 Weeks
(0)
USD153.00
Estimated Lead Time : 6 - 8 Weeks
Control Box TF 832 110V unit pack
Estimated Lead Time : 6 - 8 Weeks
(0)
USD204.00
Estimated Lead Time : 6 - 8 Weeks
Control Box DMG 972 Mod.04 unit pack
Estimated Lead Time : 6 - 8 Weeks
(0)
USD374.00
Estimated Lead Time : 6 - 8 Weeks
CONTROL BOX DMG 970-N MOD. 03 UNIT PACK
Estimated Lead Time : 6-8 Weeks
(0)
USD671.00
Estimated Lead Time : 6-8 Weeks
CONTROL BOX DMG 972-N MOD. 01
Estimated Lead Time : 6-8 Weeks
(0)
USD491.00
Estimated Lead Time : 6-8 Weeks
CONTROL BOX DMG 973-N MOD. 01 UNIT PACK
Estimated Lead Time : 6-8 Weeks
(0)
USD477.00
Estimated Lead Time : 6-8 Weeks
UV Cell UVZE 780 unit pack
Estimated Lead Time : Usually ships in 1-10 working days.
(0)
USD3,089.00
Estimated Lead Time : Usually ships in 1-10 working days.
UV Cell UV tube P 607 200V
Estimated Lead Time : 6 - 8 Weeks
(0)
USD321.00
Estimated Lead Time : 6 - 8 Weeks
Actuator LKS 131-07 (B2-5 S5) unit pack
Estimated Lead Time : 6-8 Weeks
(0)
USD986.00
Estimated Lead Time : 6-8 Weeks
Actuator LKS 131-18 (B6-5 S3) unit pack
Estimated Lead Time : 6 - 8 Weeks
(0)
USD759.00
Estimated Lead Time : 6 - 8 Weeks
110V SOLENOID COIL (VE4025A)
Estimated Lead Time : 8 - 10 weeks.
(0)
USD176.00
Estimated Lead Time : 8 - 10 weeks.
MAGNETE EVR/F 80.3 360MB 220-240V
Estimated Lead Time : 8 - 10 weeks.
(0)
USD1,278.00
Estimated Lead Time : 8 - 10 weeks.
Coil Sub Assembly VE4000B/C DN50 200mbar 220-240v
Estimated Lead Time : 6-8 Weeks
(0)
USD351.00
Estimated Lead Time : 6-8 Weeks
Coil Sub Assembly VE4000B/C DN50 360mbar 220-240v
Estimated Lead Time : 8 - 10 weeks.
(0)
USD416.00
Estimated Lead Time : 8 - 10 weeks.
NPT MOUNT, 1.5-7 PSI, W/MANUAL RESET
Estimated Lead Time : 6 Weeks
(0)
USD227.00
Estimated Lead Time : 6 Weeks
socket
Estimated Lead Time : 6 - 8 Weeks
(0)
USD156.00
Estimated Lead Time : 6 - 8 Weeks
UV FLAME DETECTOR
same day shipping
(5)
USD1,256.00
same day shipping
Control Box TF 836 unit pack
Estimated Lead Time : 6 - 8 Weeks
(0)
USD197.00
Estimated Lead Time : 6 - 8 Weeks
Control Box TF 830.3 EOGB
Estimated Lead Time : 6 - 8 Weeks
(0)
USD167.00
Estimated Lead Time : 6 - 8 Weeks
Control Box TF 974 unit pack
Estimated Lead Time : 6-8 Weeks
(0)
USD221.00
Estimated Lead Time : 6-8 Weeks